Loading...

Kingsdown Road, St Margaret’s

We completed this holiday home on Kingsdown Road, St Margaret’s, in April of 2023. The timber frame building is four metres high and has a footprint of seventy square metres. The property has an air source heat pump, underfloor heating, water treatment plant and electric VELUX window’s.

  • Showing the timber frame, barn style outbuilding
  • Showing the timber frame, barn style outbuilding and french doors
  • Bifold doors
  • Bifold doors open to show the interior
  • Exterior Showing the timber frame, barn style outbuilding
  • Timber frame, barn style outbuilding
  • Constructed timber outbuilding and beautiful view
  • Constructed timber outbuilding and beautiful view from behind the trees
  • Interior photo of mirror, plants and oak furniture
  • Master bedroom with lovely view outside
  • Master bedroom, parquet style flooring, velux windows
  • Master bedroom, parquet style flooring, velux windows
  • Generous living space an wood burner
  • The living space
  • Living space with parquet style flooring
  • Kitchen area with breakfast bar
  • Toilet bathroom
  • Toilet bathroom and shower
  • State of the art cooker in the kitchen
  • Cooker worktops and stylish cupboards
  • Modern stylish kitchen and sink
  • Modern stylish kitchen and breakfast bar
  • Super stylish breakfast bar and kitchen
  • Super stylish, modern breakfast bar and kitchen
  • Dining area, leather benches and oak table
  • Breakfast and dining area looking out onto the terrace area
  • Stunning kitchen, dining and living area
  • Small outside decked area
  • Parquet flooring
  • Outside decking are being constructed
  • Outside are with dark barn style wooden cladding
  • Interior walls being plastered and electrics going in
  • Exterior showing nearly completed building
  • Exterior showing nearly completed building with scaffolding
  • Roof being constructed
  • Underfloor heating
  • Roof trusses
  • Interior showing roof trusses
  • Interior in the process of being insulated
  • Exterior under construction
  • Roof under construction
  • Roof being constructed
  • Steel going in
  • Steel and wood construction
  • Blockwork being constructed
  • Drainage and Groundworks completed
  • Drainage and Groundworks
  • Steel frame ready for concrete screed
  • Membrane ready for steel and concrete pour
  • Groundworks and drainage
  • Aggregate going in
  • Groundworks part complete
  • Breaking Ground
  • Ground being prepared
  • Architects drawing
Contact us

  info@youngconstructionservices.co.uk
  01227 532295

Young Construction Services
EKIFT, Highstreet Road, Faversham
Kent, ME13 9EN

Monday - Friday: 7am-5.30pm
Saturday 7am-1.30pm
Sunday: Closed


   

This field is for validation purposes and should be left unchanged.